Sany Heavy Industry Co., Ltd.: Keep busy! This 240-ton machine works fast, earns more, and is more competitive in taking big jobs.

November 01, 2023

Not so long ago,Li Junping, boss of Dongguan Juntong Machinery Leasing Co., Ltd.Got a mission.:It is necessary to complete the hoisting and positioning of the welded steel frame and the double-beam bridge crane in the field.。Once the hoisting equipment enters the site,A lot of work on the site will be stopped.,So,Operation efficiency is most valued by Party A.

Originally,It is planned to arrange a 300-ton crane to enter the site with super-lift.,But the venue is limited and the time is urgent.,Party A is full of hesitation about the choice of hoisting equipment.。

After Li Junping learned about the situation,,Think you have it.STC2400C8-8You can try。

He said:“First,This is the first 240-ton Truck_crane/ 'target='_blank' style='color:blue;'>Truck Crane in the industry.,8-section main boom full extension 90m,Maximum arm length 120.5m,The lifting performance is not inferior to that of a 300-ton crane.。Second,This car is more flexible.,Takes up less floor space。Third,The tonnage is a little smaller,The class fee will also be lower.,To a certain extent, this can reduce the cost of Party A.。”

After careful consideration by both sides,,STC2400C8-8 is coming in。

The first morning,Equipment starts to support Vehicle assembly,In the afternoon, the hoisting and welding of steel frame was officially started.,STC2400C8-8 Fully extended arm 80m,The lifting weight reached 15 tons.,It is easy to complete the hoisting task without the installation of super-lift.。After hoisting is completed,STC2400C8-8 After unloading part of the counterweight, immediately start the transition.。

Li Junping introduced:“The original plan is to use 300 tons to bring the super-lift into the site.,It may take more than half a day to transfer and assemble.。

The next morning,STC2400C8-8 to assemble the counterweight,Carry out boom commissioning。The double-beam bridge crane was lifted at 11 o'clock on the same day.,75m fully extended arm,Lifting capacity up to 20 tons,Successfully complete the hoisting task。

Li Junping said:“STC2400C8-8. Efficient operation,The lifting time is greatly reduced compared with the original plan.,Party a is very satisfied with this.。Other than that,In terms of operating costs,This 240 ton also gave me some surprises.。”

“This Truck has a strong lifting capacity.,Many working conditions do not require superlift.,Plus the ability of short-distance heavy-duty transfer is good.,I can saveSave the cost of two large trailers.。”

“The crane is from Dongguan to Huizhou.,The whole journey is nearly 100 kilometers.,The cost of two trailers is nearly 3000 yuan.,In this way, I didn't lose money but made a little profit.,It is a win-win situation with Party A.,This makes me more competitive in taking big jobs in the future.。

Dongguan Juntong Hoisting Equipment Leasing Co., Ltd.

It was founded in 2019,Designed to provide customers with superior lifting and hoisting、Handling and loading、Leasing of construction machinery、Crane rental、Forklift rental and other services。In recent years.,The company has developed rapidly and maintained a good state of operation.。So far,The company already has 13 Sany cranes.,Covering products from 25 to 240 tons,Provide a more complete solution for customer needs。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China