Products Center
More Products

Cummins: The generator set has been installed, and this operation is very reassuring

October 24, 2023

To provide customers with better quality products.

And better user experience

Cummins Power Services First

Before formal delivery
There is a wave of reassuring“Force operation”

Debugging

The elaborate design is amazing.

It only takes 12 seconds for Cummins Power to connect 14 units in parallel

CooperateUPS(Uninterruptible power supply)

There is almost no feeling of power failure.

For projects with limited spaces

Cummins Power can also design containerized units on the outside

Powerbloc™Is to represent the product.

Not only highly integrated throughout the power system

But also realize that stacking of the machine set.

Flexibility to meet customer needs

Delivery

The intimate service is uninterrupted.

Regular maintenance of the unit will be carried out

Check the status of the unit

Ensure that the unit performance is always online

On Double Eleven、Spring Festival Gala, etcLarge active nodes

Cummins Power also offers custom services.

Protect electricity for customers

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China