October 16, 2023
The first three quarters,Ordinary Highway Department of Henan Province“Spring battle、Summer fortifications、Work hard in autumn、Winter lift”Main line of annual maintenance work,Continue to promote the effective development of key maintenance work throughout the year。
By the end of September,A total of 86 pits have been excavated and repaired on ordinary trunk highways in Henan Province.80 thousand square meters,Dealing with Subsidence and Rutting 17.90,000 square meters,Crack pouring is 9.21 million meters;Treatment of cracks 43.70 thousand square meters,Renovation of 43.74 million square meters of shoulder slope,Dredge 14.46 million meters of drainage system,Maintenance of 4837 subgrade structures;27432 Division for Maintenance and Safety Facilities,Update sign placard 16156 block,Marking 93.90,000 square meters,3 million 900 thousand road trees were replanted,6.58 million square meters of greening management and protection。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China