Products Center
More Products

[Product Elegance] Fangyuan Mixing Station Actively Participates in Guyana Traffic Construction Project

October 13, 2023

Construction Site of New Demerara River Bridge Project in Guyana, South America,Fangyuan Group MultipleHZSType 120 box-type Concrete Mixing Plant stands tall,After careful debugging,All mixing stations have been put into production smoothly.。

The New Demerara River Bridge Project is the largest transport infrastructure project in Guyana,Located on the Medlala River in Georgetown, Guyana,It is a reinforced concrete river-crossing bridge.,Cable-stayed structure is adopted for the main bridge,The total length is about 2800 meters.,Four lanes in both directions+Double non-motorized Vehicle lanes,Design speed 80 km/Hour,Service life: 100 years。After the completion of the new bridge,It will shorten the travel time by three quarters on both sides of the Demerara River.,Expand vessel traffic by more than 2 times,The daily maintenance cost of the bridge is greatly reduced.。

The New Demerara River Bridge Project is the most important livelihood project of the Government of Guyana,It is of great significance to the residents on both sides of the Demerara River.,The project is expected to benefit the local people after completion.,Drive the economic development of surrounding regions。

Fangyuan Mixing Station Actively Participates in Project Construction,Contribute to Guyana's economic development!

Complete Equipment Co., LtdYang Yongsheng

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China