Products Center
More Products

New developments! The feasibility study report of Zhanhai High-speed Railway will be approved by the end of September.

September 07, 2023

News from Zhanjiang Development and Reform Bureau:August 31,Zhanhai High-speed Railway Has Ushered in Milestone New Progress,Actively organized and coordinated by Zhanjiang Development and Reform Bureau,Zhanhai High-speed Railway Social Stability Risk Assessment Expert Review Meeting Successfully Held in Leizhou City。

Industry experts were invited to the meeting.、Relevant units directly under the municipal government、Counties along the line(City、District)And villagers' representatives.,The meeting heard a report on the results of social risk analysis and assessment of Zhanhai High-speed Railway.,And demonstrate the design technical parameters of the project.,It is considered that all the design and technical parameters of the project are in line with《Main technical policies of railway》And《Code for design of high speed railway》And other relevant requirements。

This meeting discussed the legality of the implementation of the project construction.、Rationality、The feasibility and controllability were reviewed.,And formed the opinions of the expert group.。

The topic of social stability risk is one of the essential elements of the feasibility study approval.,The feasibility study of Zhanhai High-speed Railway will be completed by the end of September.。

Next step,Zhanjiang Development and Reform Bureau will strengthen communication and docking with the counties and cities along the Zhanhai high-speed railway.,Go All Out to Promote the Preliminary Construction of Zhanhai High-speed Railway,Provide strong guarantee for the construction of the project。(Finished)

  Project overview:

The main line of Zhanhai High-speed Railway Project is drawn from Zhanjiang North Railway Station.,To the south through Leizhou City、Introduction of Beigang Ferry Station in Xuwen County,Crossing Qiongzhou Strait to Nangang Ferry Station,After leaving the station, it is connected to the high-speed railway around Hainan Island.,The Zhanjiang-Haian Railway Project and the Qiongzhou Strait Sea-Crossing Ferry Project。Qiongzhou Strait Sea-Crossing Ferry Project“People crossing the sea”Programme。

Length of new onshore main line: 128.852km,4 new stations,1 line station,Xuwen parking lot 1,Main line grand bridge、There are 28 large and medium-sized bridges with a total length of 95.114km,No tunnel,The bridge ratio of the whole line is 73.82%。

The Qiongzhou Strait Crossing Project include:New high-speed rail south、North Harbor、Wharf and land works,High-speed railway station building is set in the port、Waiting yard and other supporting facilities;Existing Sanya EMU Station、Reconstruction and Expansion of Haikou Intercity EMU Station;Reconstruction of Haikou Station。

The design speed is proposed to be 350km/h,The total investment of the project is about 540.9.2 billion yuan,Guangdong Section 353.1.3 billion yuan,The total construction period of the project is 4 years.。

Schematic Diagram of Zhanhai High-speed Railway Network Planning

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China