August 28, 2023
A new generation of KobelcoSK130 and 150LC-Since the listing of 11 Excavators, it has been widely accepted.“Steel Wire"Good reviews from my friends,In order to meet the operational needs of different operators to a greater extent.,The diverter valve cover can now be ordered and installed by、Install the handle and other parts,To realize the reversing function of the operating handle.!
Without further ado.,Go straight to the tutorial。
01
Required parts

02
Installation method
1,Remove the cover plate:(Tool:5mmHexagon socket)

● Remove 4 bolts on the cover plate.,As shown in Figure 1。
● Remove the bolt on the shaft.,The shaft cannot be turned,As shown in Figure 3。
2,Install a new cover plate:(Tool:5mmHexagon socket)

● When installing a new cover plateThe direction needs to be confirmed,As shown in Figure 1。
● Confirm the direction when installing the oil seal,Letter identification faces outward,As shown in Figure 2。
● Install the 4 retaining bolt,As shown in Figure 3。
3,Install the handle:(Tool:5mmHexagon socket)

● When installing the handleIt is necessary to confirm the pointer and the cover plate.ISOMark alignment,As shown in Figure 2。
● Handle Pointer andOn the cover plateISOInstall the locking bolt after marking alignment,As shown in Figure 2。
03
Mode switching




04
Designation of required parts
|
Serial number |
Part designation |
Part name |
|
1 |
YN30V01057P1 |
Cover plate |
|
2 |
YN30V01085P1 |
Handle |
|
3 |
ZS28C06016 |
Handle mounting bolt |
|
4 |
ZW16X06000 |
Handle mounting gasket |
|
5 |
YN30V01074P1 |
Locking bolt |
|
6 |
YN30V01036P1 |
Sealing ring |
|
7 |
ZP26D06020 |
Stop Pin |
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China