August 28, 2023
The action efficiency is improved by 40% compared with the same level in the industry%Above
Performance improvement:
Ding LiTSeries arm type,Equipped with the world's leading hydraulic components,The matching degree is high、The coordination of the composite action of the whole machine is good。At the same time,The hydraulic system adopts high-performance proportional electronic control technology.,Strong oil control ability、The precision is high、The pressure loss is small。At present,Ding LiTThe whole lifting process of the series boom type takes 150~Between 180 seconds,Compared with the same level in the industry, the arm action efficiency is improved by 40%Above!

On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China