Products Center
More Products

Xugong University G Experience Officer | Join hands with XE205GH to become "hand" rich!

July 27, 2023

 “Hold the handle and you will have a head start.!”

This isXE205GHVoice of Operator Hu Yongjun

What you hold in your hands reflects what you hold in your heart.

Two-handed control“Manipulator”

Work together to create wealth

This period is large“G”Experience Officer

Walk into the construction site of Changjun Road, Changsha Municipal Road

Learn about Excavator master Hu Yongjun

YesXE205GHA unique experience

01“Manipulator”The ultimate control

Master Hu has been driving an Excavator for more than ten years.,It cannot be said that the control handle is realized.“Man-machine integration”,For the bucket、Big arm、The whole set of forearm“Manipulator”Control experience,Still have a lot to say.。

“XE205GHThe shoveling force is very strong,Good coordination。The electric control handle is very light.,It's a quick move,People's words are very relaxed.,It is not tiring to work.,The efficiency will be improved naturally.。”

“(Electrically controlled)That's where the big trend is.,Just say,There is still a process of adaptation for people's hand feeling.,Pursue efficiency and maneuverability。”

XE205GHAdopt full electric control hydraulic system,Better pump and valve coordination,No throttling required,Quick oil return,Gravitational potential energy recovery。“Squeeze dry”Value per drop of fuel,More efficient,More fuel efficient。

02“Manipulator”A proud arm span

For“Manipulator”The length of,Master Hu is very keen.。“ Feeling (XE205GH)Boom、The stick is needed(Than the same tonnage I've driven before.)Long”,The advantages of this for construction are also obvious.。

“Metaphorically speaking,When laying the foundation for the culvert, Need (Upper arm and lower arm)A little longer,Walk a little sideways,And quick,To the concrete.,Throw it over,It's in place and smooth。”

Master Hu is right“Manipulator”Intuitive sense of length,Supported by data。

XE205GHWorking radius up to 9.92m,Collocation 1m³Big Bucket,You can have it in any construction site.“He who is near the water tower gets the moon first”Operational advantages。

03“Manipulator”The surging power of

For the power system behind this manipulator,,Master Hu also has his own unique understanding.。

“6-cylinder engine,It's not difficult to defeat it.。”

Facing different working conditions on the construction site,Whether it's land cracked by days of exposure to the sun,,Or the muddy earthwork soaked by water at the bottom of the foundation pit?,Or piles of gravel.,It's not difficult to support the six-cylinder engine.XE205GH。

“It is not only comfortable for people to operate.,The loading speed has also been improved.,More efficient loading。”

XE205GHIt is equipped with a customized Cummins IV low-speed high-torque engine.。Rated engine output up to 129kW,Transient response time reduced by 20 percent%,Maximum torque up to 850 N·M/1200rpm,Naturally, it can bring faster working speed and stronger digging force to the whole machine.。

Two-handed control“Manipulator”

These are two different hands.

A pair stained with mud, perhaps with a wound.

A pair of infinite power has machinery. “Magic”

These are two pairs of identical hands.

They all strive for the same goal.

Maintain practical strength

Hold up the hope of getting rich together

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China