Products Center
More Products

Shandong Weihai Rongcheng HLB5000 All-in-One Machine Successfully Put into Production

July 17, 2023

 On July 1, 2023, after more than 30 days of intensive installation by the front installation technicians,,Our company sells with Shandong Weihai Guantong Road and Bridge.HLBThe 5000 all-in-one machine was finally installed successfully.,Put into production smoothly。

    The equipment adopts the exhaust waste heat recovery device newly developed by our company.,The heat of that tail gas is recycle for the second time.,The fuel required for production is greatly reduced.,After much trial and error,Reduce 2 m3 of natural gas per ton of finished material,At the same time, this set of equipment adopts the foaming asphalt warm mixing device.,And that temperature of the stone dure mixing is greatly reduce.。

Rongcheng, Weihai, ShandongHLB5000 asphalt mixing station with hot recycling all-in-one machine

Waste heat recovery device

    Facing the fierce market competition,In recent years, the company has invested more than 20 million yuan to introduce the laser blanking line.,Flexible Bending Center Imported from Italy,Fanuc,Kawasaki robot and other fully automatic welding,Powder coating and other production lines,The product quality has been greatly improved.。

Imported from ItalySavanini Flexible Bending Production Center

Intelligent robot production line

Large laser uncoiling line

Full-automatic punching and folding composite center

Large dusting room

Small piece dusting room and automatic transportation track

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China