Shanggong Machinery: double machine linkage! Track type, walking type double wheel stir the same field competition, dancing Hangzhou!

July 03, 2023

Work as a mechanical workerMS45EDouble-wheel mixing drill“Tracked”Meet“Walking style”Compete on the same stage,Who can win?

Wait and see!

▲Project site

Recently,Note the concern

The first crawler-type double-wheel mixing drilling rig of Shanggong Machinery,After the first unit is delivered off the production line,Direct to Hangzhou Zhengda Qingchunbao Headquarter Land Project,Meet its actual combat test,At present, with high efficiency,、High standards、Low energy consumption,

Completion of the first phase of construction,Win the first battle!

Picture
▲MS45EConstruction operation of crawler-type double-wheel mixing drilling rigZhengda Qingchunbao Headquarter Land Project is located in Dongyue Community, Liuliu Street, Xihu District, Hangzhou City,The project is the county magistrate of Zhejiang Province.“152”Engineering Promotion Project,Design and construction of 4 office buildings,The total building area is about 120000 square meters.。The project will further promote the focus on building a complete core industry chain of financial science and technology in Xixi Valley in the future.,It means a lot。▲Effect drawing of project completion

  According to the data around the plant area,The project site is located in the wetland landscape control area.,Must satisfy the creation of public space、Building roof optimization、Skyline control、Characteristic landscape protection and other urban design requirements。More importantly,,Although the plot has excellent location conditions,,But the terrain is very special.,Especially, the height difference between the north and the south of the original site is about 10 meters.,It greatly increases the difficulty of construction.。

▲Engineering geological profile of the projectIn the face of this complex situation,The project party shall make rational use of the existing site.,Carry out design according to local conditions,Set the platform from south to north to treat the height difference of the original site,Use climbing products to form a sense of hierarchy,Most of the sites are non-paved roads with soft soil structure.,The rain wash causes the mud to be slippery.,Underdrain is vertical and horizontal,But such a complex transition environment,It's just showingMS45EThe Best Time for Off-road Performance and Transfer Ability of Crawler-type Double-wheel Mixing Drill。

▲MS45EConstruction operation of crawler-type double-wheel mixing drilling rigIn order to meet all kinds of complex and harsh working conditions in China,MS45EHigh-stability chassis structure is adopted for the chassis of crawler-type double-wheel mixing rig.,Folding overhanging beam structure、Xtensible crawler chassis、And that stability of the Pile Frame is improve,At the same time, the grounding width and grounding area of the track shall be widened.,And that stability is improve。

Picture

▲MS45EConstruction operation of crawler-type double-wheel mixing drilling rig

Facing the steep slope of the original site with a height difference of about 10 meters from north to south.,The big man with a deadweight of 100 tons can do well in the construction work on site.,What a surprise!MS45EThe excellent transfer ability of the crawler-type double-wheel mixing rig was repeatedly praised by the site manager.!▲MS45EConstruction operation of crawler-type double-wheel mixing drilling rig

The construction task of this project is to build a cement-soil mixing water-stop diaphragm wall with the same thickness before the excavation of the foundation pit.,The total volume of water stop wall is 15000m3,Depth 20~50m,Wall thickness 800mm,Considering the tight schedule,,The project is stationed in Shanggong MachineryMS45ETwo double-wheel mixing drilling rigs of crawler type and walking type are used for construction.,The two brothers are in the same frame hand in hand.,Compete on the same stage,Dancing Hangzhou!

▲MS45ECrawler-type and walking-type double-wheel mixing rigs compete on the same stage

▲MS45EConstruction operation of walking double-wheel mixing drilling rig

Shanggong MachineryMS45EThe double-wheel mixing drilling rig is directly driven by variable frequency motor instead of the traditional hydraulic transmission system.,It is more energy-saving and stable、Green and environmental protection,Not only the output torque is large,、And that construction efficiency is high、But also adopt that forced cool technology of the motor.,And that reliability of the system is high、Convenient maintenance、Lower running costs。

At the same time,The equipment adopts intelligent control system.,The milling head can be preset、Hydraulic drill、Air Compressor、Control parameters and construction parameters such as mixing head inclination shall be monitored.,Verticality can be checked、Collect and monitor the mud flow,Data storage,Ensure the quality of the wall。

Domestic key projects,Supporting professional construction equipment。Shanggong Machinery Inherits“Market-oriented product development”Idea,As always, make use of the deep accumulation in the field of Piling Machinery,Fully meet customer construction needs,To provide professional services to our customers,Create value。

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China