June 25, 2023
Recently,The left side of the Ba River Bridge of Cangba Expressway, supervised by the supervision company of the Provincial Highway Design Institute, was successfully closed.。Bahe River Bridge is the longest single span continuous rigid frame bridge in Cangba Expressway.,Total length 504.5 meters,The maximum bridge height is 75 meters.,The main bridge adopts(104+185+104)Meters prestressed concrete continuous rigid frame,Double-limb thin-wall pier is adopted for the main pier。The bridge has a high technical standard.、The construction is difficult、High security risk,It is the key control project of the whole line.。To ensure the precise closure of the whole bridge,JL4. Director Office strengthens process control,Strengthen elevation and linear control,Assemble the formwork、Steel bar binding、Every process such as bellows installation is strictly checked.,Efficient、The closure of the main span is precisely realized.。(Sichuan Traffic News)
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202306/2023062516124012.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China