Products Center
More Products

XCMG XCA160L8, picked a circle and said that the material must be it!

May 30, 2023

I want to buy a car economically now.,But this starting point is easy to be wrong.,After buying it, this aspect is not enough.、There is something missing in that area.,Let's analyze it today.,Take everyone to pick one.“High-altitude Hoisting Exquisite Products in Dry Cities”,You are satisfied with the material package.!

Direct open card——XugongXCA160L8 !

PictureTo avoid difficult choices,Eight-section boom can be used directly when the main boom is in place in one step,88 meters,Maximum lifting capacity 6.5t,Main boom plus auxiliary boom116.6mMaximum lifting load 1.6t,Regardless of Tower Crane disassembly and assembly、High floor,Any hoisting height can be reached.!

I think the arm is high enough.,The chassis should be stable.,Otherwise, who dares to stagger??

XCMG directly achieves the outrigger span9.1×7.9Meters,There is no need to worry about the unstable lifting chassis.,Hang yourself as hard as you can.,Keep you safe。

But that's not enough.,According to the principle of leverage,The counterweight has to keep up.,That's more or less appropriate?

XugongXCA160L860 MaxtCounterweight,Calculate the moment of gravity,The maximum lifting moment of the longest main boom is 2043KN.m,Lifting moment is related to lifting capacity, Oh ,This level must be enough.!

60tLet's not say the counterweight is high.,It is also appropriate to send far away.,Operating range up to74 meters,Hanging friends,Is there any problem with the working condition coverage??

“Worried that it is not easy to carry too much counterweight”?Now we all talk about operating costs.,I already asked.,XugongXCA160L830 can be taken with the VehicletCounterweight and backing plate,The remaining 30tA car pulled away.,That's a relief.!
“Worry about heavy loads,Have no interest in going on a mission”?13tIs the tension winch enough?,You can't just look at the surface.,I measured it secretly,It's used22mmThe wire rope,This material is really enough.,What's there to worry about??
Get on the bus with 221.kWEngine,Is it big enough?,It is said that double hair is fuel-efficient.,But this power can not be too small.,And that burden of high-power and heavy-load operation is small.,Larger lifting performance margin,The security is also more sufficient.!

Besides, this all-ground chassis.,Fast12-speed automatic transmission、Also with transfer case(Only those who know the business know.,Transfer case can adapt to different driving conditions),Full brake,Full axle steering,6 steering modes,Heh,Luxurious enough!Turning diameter of five-axle chassis 18.5m,Minimum ground clearance 309mm,What is the whole ground??This is the whole ground.!

 


There's more.,I can't say enough about it.,I'm afraid you can't remember,Anyway, I want to buy a car to save trouble.,Listen to me.!
”What else do you think? Leave a message in the comment area.!

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China