May 17, 2023
In the country“Expand domestic demand”Under the grand strategy
As the main engineering Vehicle to promote the rapid development of urban construction.
The Truck-mounted crane is rising day by day in the hoisting industry
Hoist,Hang far、Lifting weight、Crane speed has become an important reference for car selection.
To meet the needs of users
Foton Leisa Launches New Truck-mounted Crane Series Products
With its outstanding performance, it has won the trust of card friends.
Super-long boom with excellent performance
Jib length,An inch long and an inch strong.,The average length of the crane arm is 0% longer than that of the competitor.5-1 meter,Leading competitor 2-3 years。
The section is large,Octagon、Great Arc、Floating slider,High strength,The rigidity is good,Lifting performance is superior to that of competing products5-8%。
Precise lifting, energy saving and high efficiency
High and low speed automatic switching valve with double pump confluence,Can easily realize compound action,Smooth conversion of each action,The micro-motion effect is stable and reliable.;Small size、Light weight、The flow is large,Bear high pressure;Integrated relief valve,Ensure system security。
Planetary reducer is selected for the slewing mechanism.,Configure low speed、High-torque hydraulic motor and two-way buffer balance valve,And that micro-motion performance is good,Smoother start and stop。
The winch is equipped with hydraulic winch and high pressure high speed plunger motor.,High plot ratio、Low noise、Long life、The driving force is uniform、Excellent impact resistance。
The main pump is a double-gear high-pressure pump.,Provides higher oil pressure、Higher volumetric efficiency、Longer service life;Gear pump for outrigger slewing circuit,When the slewing does not work,Flowing through the main valve for winding,Realizing large flow of winch double oil pump,And that work efficiency of the winch is greatly improved.。
Thickening of wall thickness of boom cylinder、Piston rod thickening,The telescopic capacity of the crane arm with load is greatly improved。
Safe and reliable quality assurance
The core key components of Truck-mounted crane are selected from the mainstream suppliers in the industry.。
Over 3000 times of top loading strengthening test,The whole machine exceeds 2000 quality control points,The quality is guaranteed。
Super-strong stability of large-span outrigger
Single stage 6 meters,The large span of double-stage 8m front outrigger is the guarantee of super stability of truck-mounted crane,Fixing is optional、Single-chamber and double-chamber rear leg。
Humanized configuration and comfortable operation
Automatic hook retracting device,Save time、Save effort、Safer。
High seat,Have a wider field of vision,The operation is smoother,The hoisting is more accurate。
Refined design and convenient maintenance
Elegant central body of revolution,The structure is exquisite,Small size,Light weight,Can be conveniently disassemble, assembled and maintain from that side surface of the rotary table。
Structural optimization,Outrigger horizontal cylinder,Vertical cylinder,Can be disassembled and maintained from the window of the outrigger box。
November 6, 2024—8 days,The 7th Conference on Standardization of Construction Machinery Industry and the Annual Meeting of Standardization Working Committee of China Construction Machinery Industry Association in 2024 were successfully held in Qi
November eighth,The Office of the National Leading Group for the Recognition and Management of High-tech Enterprises issued《Publicize the first batch of high-tech enterprises identified and filed by Xiamen accreditation agencies in 2024》。 Fujian Ji
Recently,By(Country)Technical Information Institute of Building Materials Industry、Sponsored by Concrete Special Committee of China Bulk Cement Promotion and Development Association,Jointly sponsored by Zoomlion and other companiesThe 20th National Com
Recently,Successful Delivery of Wenzhou Huabang Concrete Mixing Station,Enter into commissioning and production stage。3 ZoomlionHZSThe production line of the 270 top-mounted mixing station is lined up,Fifteen giant powder tanks tower over a three-story
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China