Products Center
More Products

Xian'an invested 434 million yuan to open the "aorta" of flood discharge and waterlogging control

May 16, 2023

For days,Water Conservancy in Xian'an District is progressing in an orderly manner,Running out of water conservancy project construction“Acceleration”,Ensure safe flood season。According to the Water Conservancy and Lake Bureau of Xian'an District,This year, there are six water conservancy projects to be continued or newly built in this area.,Total investment 4.3.4 billion yuan,Make every effort to get through flood discharge and waterlogging“Aorta”。

In Xian'an District“On both sides of a river”Construction site of water environment comprehensive treatment project,The machine roared,The Excavator wields its long arms,Yeah, the river、The bank slope shall be constructed,The underwater project is nearing completion.。The project starts from Jingui West Bridge.,It stops at National Highway 107,Total length 8.91 kilometers,The total investment exceeds 200 million yuan.。Upon completion of the project,The flood control capacity of this section of the Ganhe River will be increased from“Once in less than 20 years”Raise to“Once in 50 years”,Enhance the flood control capacity of Ganhe River,Improve the ecological environment along the line。

At the construction site of Xiangyang Lake Section of Ganhe River Phase II System Regulation Project,Bulldozers take advantage of fine weather,Fill earthwork、Reinforce the dike body,Race against time to push forward the project construction。This project is the second round of water conservancy short board project in our province.,The investment is more than 660 million yuan.,At present, 90% of the project progress has been completed%。

At the construction site of the reinforcement project of Qingyalong Reservoir in Gaoqiao Town,The workers are building the steps of the dam.。At present, the dam foundation grouting has been completed.、Dam body concrete wall anti-seepage、Dam slope reconstruction、Drainage channel renovation, etc,It is expected that all construction tasks will be completed before the flood season.。At the same time,Problems Exposed by Major Drought in 2022,Xian'an District Intensifies the Construction of Irrigation and Drinking Water Emergency Projects,The total investment is 11.99 million yuan for channel irrigation and drinking water drought relief.,Pipeline network extension and expansion of 57 small-scale centralized water supply projects in the whole region;To Nanchuan Main Canal、Four Gate Tower Main Canal、East main canal、The south main canal and the branch canal are cleared.、Dredging、Complete the slope、Dredging、Maintenance, etc,Ensure the safety of rural drinking water and irrigation water supply。

Produce:Xianning Daily

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China