The era of cost reduction and efficiency enhancement for all staff
Power units are no exception.
Cummins PowerPowerBloc™
Container-type diesel Generator set
The main hit is one.“Province”Word
Construction、Debugging
Save time
【Traditional unit】
Computer Room、Oil road construction
Unit installation、260 days in total for commissioning
80 days after the arrival of the unit
【Container-type unit】
Steel platform、Oil road construction
Unit installation、161 days in total for commissioning
56 days after the unit is mobilized
【PowerBloc™】
Basic platform、Unit installation and commissioning in total113 days
After the unit is mobilized, only31 days
Time reduced by more than half
Put into operation earlier,Create value
Highly integrated
Save land
PowerBloc™In a 40-foot standard container
Highly integrated power、Cooling、Fuel、Noise reduction
Six systems of control and fire protection
Single unit is less than traditional container1 square meterSpace
Top exhaust and stackable design
Average savings30%Space
Maintenance is simple
Save money
The steel platform is replaced by a simple maintenance platform
There is no need to build a separate oil circuit.、Fire fighting and other systems
Save material,Reduce labor costs
Reduction in overall operating costs20%
Convenient for operation and maintenance
Peace of mind
Plug in the connector quickly,Plug and play
Removable box top、Radiator core pack and fan
2 end doors、3 side doors for daily operation and maintenance
PowerBloc™Container-type diesel Generator set
How much can you save?!
Want to knowPowerBloc™
It's on、How little noise is there when it is running?
The next issue of Da Na will bring you an immersive experience.
Don't miss it
Several XCMG climbing platform fire engines with a total value of more than 10 million yuan lined up to go overseas with surging momentum.,Protect the beautiful world In recent years,XCMG Fire Fighting for High-rise Rescue、Industrial
November nineteenth—22nd,Secretary of the Party Committee of the company、Chairman Peng Zhengyong led a team to Xinjiang to carry out a series of business activities,Visited the Xinjiang Autonomous Region Highway Development Center respectively.、X
bauma CHINA 2024(Shanghai BMW show)Will be November 26-The curtain was raised at the Shanghai New International Expo Center on the 29th.!Wirtgen Group will bring Wirtgen、Fogler、Humvee、Kelei's Four Brands Appear at the Exhibition,Showcase innovativ
When the north wind passes through,The most romantic thing is a night of spring breeze.,It was delivered.“To turn thousands of pear trees here in full bloom white.”A grand scene。However,Behind this beauty.,With the increasing use of tr
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China