March 29, 2023

【TRies bridge expansion durability test】
Ding Li“Factory of the future”Intelligent inspection workshop
Perform rigorous testing that exceeds industry standards many times over
36~44 metersTSeries modular arm type
Reliability testing:Complete 4000 loading action cycles for 60 consecutive days(1000 requirements at the same level in the industry)
Enlarged bridge durability test:Complete 50000 action cycles for 90 consecutive days(The industry requires 10000 times at the same level.)
22~34 metersMSeries modular arm type
Reliability testing:Complete 5000 loading action cycles for 60 consecutive days(Industry peer requirements 800~1000)
16~22 metersDSeries modular arm type
Reliability testing:Complete 5000 loading action cycles for 60 consecutive days(Industry peer requirements 800~1000)
Strictly control the quality Build a strong line of quality defense,You are trustworthy
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202303/2023032914160920.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
April 28, 2026,Cummins Generator Technology(China)Ltd(Hereinafter referred to as:CGTChina)30th anniversary,and the new product launch celebration was grandly opened in Wuxi。Cummins relevant leaders,Some customers、Partners and employee representati
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China