March 17, 2023
Life comes first,Safety is paramount。In order to be safe in the golden rescue time.、Efficient rescue of trapped people due to tunnel collapse,China Railway Construction Heavy Industry Co., Ltd.DJZ800-NDBig bore horizontal rescue drilling rig。The equipment has the function of quickly getting through the escape passage.,Its maximum drilling depth is 50 meters.,The rescue channel has an inner diameter of 800 mm.,It is a special equipment for tunnel collapse rescue.。

Drill into the site
Railway Construction Heavy IndustryDJZ800-NDBig bore horizontal rescue drilling rig has the following characteristic:
Convenient and efficient
In the emergency rescue drill of collapse,10 hours for 30 meters drilling。
On-site drilling and slag removal video
The escape route is large
Inner diameter of rescue escape passage∅800 mm,More ergonomic,Convenient for rescue and escape。
Simulation of field personnel moving in the channel
High degree of automation
Equipped with wireless remote control system,Adopt automatic drilling mode,Reduced experience requirements for operator。
Operation panel of wireless remote controller
And has strong extrication performance
Slewing escape torque up to 705 kN·Meters,The extrication propulsion is 2200 kN.,Meet the needs of equipment relief。
And that stability is strong
Equipped with side and tail support shoes,And that work stability is good。
Convenient transportation
The working device adopts modular design.,Removable for transport,Convenient for quick assembly on site。
Plateau adaptability
Adopt plateau adaptive design,Available at altitude≤4500 meters、Temperature-25~Work efficiently at 50 degrees Celsius。
Operation in high altitude and cold environment
With the railway、Highway、Water Conservancy、Large-scale construction of municipal and other projects,Long distance、The number of tunnels with large diameter is increasing.。Railway Construction Heavy IndustryDJZ800-NDBig bore Level Rescue Drilling Rig Will Practice the Responsibility of Central Enterprises,Safeguard the safe construction of the tunnel,Make tunnel emergency rescue work safer、More efficient、More scientific。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China