March 13, 2023
Busy,In the twinkling of an eye, it was the middle of March.,The motorcade arrived as scheduled,Ready for delivery,The delivery time is required to be completed within three days.,Another busy three days.,Fortunately, the delivery masters work efficiently.,Three days is enough time.。
The temperature in Nanyang has also dropped a lot these days.,Cloudy and sunny,The sun is shining and the wind is blowing,Dust drifted into the air.,Although affected by the weather,But it still can't stop our enthusiasm for work.。Loading and delivery are still running efficiently.,In order to ensure the smooth delivery of the customer's order equipment,The masters are working overtime to load the Truck.。
Customs quality inspectors arrive at Liaoyuan Company,On-site supervision of packing, sealing and delivery。
November twenty eighth Developed by China Railway Science and EngineeringThe world's first kiloton multi-mode new energy bridge erecting machine“Ying Long”Jiangji Section of Zhuhai-Zhaoqing High-speed Railway in GuangdongJJZQ-Bid 8
November twenty sixth,Much attention has been paidbauma CHINA 2024(Shanghai International Construction Machinery、Building materials machinery、Mining Machinery、Construction Vehicles and Equipment Fair)Grand opening in Shanghai New International Expo Cen
November twenty sixth bauma CHINA 2024 site XCMG joined hands Technology、Energy and Metals Group Ford River(Fortescue) Jointly announce the partnership between the two sides Signed on the spotRMB 3 billion potential green mini
On the afternoon of November 26th,With“Wisdom XCMG helps you succeed”Seminar on New Quality Productivity of High-end Open-pit Mine Equipment of XCMG was successfully held in Shanghai。Xugong Group、Chairman of XCMG、Party Secretary Yang Dongsh
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China