March 13, 2023


Busy,In the twinkling of an eye, it was the middle of March.,The motorcade arrived as scheduled,Ready for delivery,The delivery time is required to be completed within three days.,Another busy three days.,Fortunately, the delivery masters work efficiently.,Three days is enough time.。




The temperature in Nanyang has also dropped a lot these days.,Cloudy and sunny,The sun is shining and the wind is blowing,Dust drifted into the air.,Although affected by the weather,But it still can't stop our enthusiasm for work.。Loading and delivery are still running efficiently.,In order to ensure the smooth delivery of the customer's order equipment,The masters are working overtime to load the Truck.。


Customs quality inspectors arrive at Liaoyuan Company,On-site supervision of packing, sealing and delivery。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China