Full of efficiency! Shanggong Machinery MS45E Double Wheel Stirring Strength "Rage"!

February 22, 2023

Recently,In beautiful Anji County, Zhejiang Province,Shanggong MachineryMS45EDouble-wheel mixing drill,Energy saving and stability,The fighting capacity is full,Boost customer efficiency“Wild wind”!

The first phase of the infrastructure construction project in the south area of the future science and technology city in Anji County, Huzhou City, Zhejiang Province(Wealth Center)Construction project site,Shanggong MachineryMS45EThe double-wheel mixing drilling rig has made remarkable achievements in the construction of underground cement-soil water-stop mixing wall with equal thickness.,High quality and high efficiency,Has attracted a lot of praise from the construction party.。

▲Project site

The project is located on the west side of Lingfeng South Road, Anji County, Huzhou City, Zhejiang Province.、North side of Lirong Road,Total construction area of 43.0.07 million square meters,It consists of fourteen towers.,Including office building、Commercial housing、Talent apartment、Underground garage and supporting equipment room,Among,Aboveground building area 27.880,000 square meters,Underground building area 15.190,000 square meters。After the completion of the project,A centralized office will be built、Live、Consumption、Culture and other integrated service circles,It is a collection of high-quality life.、The demonstration of low-cost entrepreneurship leads the future city of science and technology.。

▲Schematic diagram after the completion of the project

With the increasing demand for the construction of the cement-soil water-stop mixing wall with the same thickness in the market year by year,,CSMConstruction method andMSSeries of double-wheel mixing rigs have been widely used,Since May last year.,Shanggong MachineryMS45EDouble-wheel mixing drilling rig has been in Wuhan、Continuous combat construction in Zhejiang and other construction sites,With its strong product strength and excellent quality, it has been well received by the market.!

▲MS45EDouble-wheel mixing construction site

This project,MS45EThe task of double-wheel mixing is to make the cement-soil mixing water-stop diaphragm wall with the same thickness underground before the excavation of foundation pit.,Total length of water stop wall is about 1050m,Wall thickness 800mm,Site to form wall 10 per day-12 pairs of stable construction tasks,Boost customer efficiency“Wild wind”!

Among,The difficulty of the project lies in the construction stratum 7.-15mIt is a gravel layer,The clay layer tends to stick to the bit during tripping in,Resulting in difficulty in drilling,At the same time, the stones in the gravel layer are sandwiched with clay.,Not only is it sticky,But also has high hardness,As a result, the mud scraper is not easy to install.。MS45EHigh adaptability to complex strata by double-wheel stirring,Can easily and effectively cut hard formation,Real-time detection during construction、Control the amount of cement slurry during construction、Drilling speed and accuracy,And that stir effect is ensured,Although the customer is working on machinery in the early stageMS45EUnderstand the advancement and high efficiency of double-wheel mixing construction,But when the construction actually started,,The strength of Shanggong machinery and equipment has given customers enough surprises.,Far more than expected。

▲MS45EDouble-wheel mixing construction site

Shanggong MachineryMS45EThe double-wheel mixing drilling rig is directly driven by variable frequency motor instead of the traditional hydraulic transmission system.,It is more energy-saving and stable、Green and environmental protection,Not only the output torque is large,、And that construction efficiency is high、But also adopt that forced cool technology of the motor.,And that reliability of the system is high、Convenient maintenance、Lower running costs。

At the same time,The equipment adopts intelligent control system.,The milling head can be preset、Hydraulic drill、Air Compressor、Control parameters and construction parameters such as mixing head inclination shall be monitored.,Verticality can be checked、Collect and monitor the mud flow,Data storage,Ensure the quality of the wall。

▲MS45EDouble-wheel mixing construction site

Symbiosis of responsibility and responsibility,Coexistence of quality and innovation,Shanggong produces every product with ingenuity,Serve every customer with care,Shanggong Machinery has been committed to providing customers with the overall solution of underground foundation.,Helping National Urban Infrastructure Construction,Fully meet customer construction needs,Shanggong Machinery will always be on the way.!

MSSeries double-wheel mixing drill(CSMConstruction method)Introduction:CSMThe method is also called milling deep mixing method.,Combined with hydraulic slotting machine&Deep mixing technology,Carry out innovative construction method of underground continuous wall。CSMThe construction method is mainly based onMS45EDouble-wheel mixing drilling rig for construction,Mainly used for building foundation pit、Underground parking、Subway station、Underground commercial street、Reservoir dam、Waterproof Curtain in Deep Foundation Project of Environmental Protection Engineering、Construction of retaining walls。

▲MSSeries crawler type/Walking-type double-wheel mix drill
Product innovation:■Adopt matureJBSeries Pile Frame,Square drill rod guide,Ensure the construction accuracy;■Real-time detection、Control the amount of cement slurry during construction、Drilling speed and accuracy,And that stir effect is ensured;■The traditional hydraulic transmission system is replaced by the direct drive of variable frequency motor.,And that mechanical efficiency is high、Low equipment cost and maintenance cost。

MS45EPerformance parameters of walking double-wheel mixing drill:

MS55EWalking stylePerformance parameters of double-wheel mixing drill:

MS45EPerformance parameters of crawler-type double-wheel mixing drill:


MSIntelligent construction management software for series double-wheel mixing drill:■Adopt synchronous data acquisition and storage technology■Slurry monitoring system■Trenching vertical monitoring system■City wall quality monitoring system■Milling wheel monitoring system


Construction process:

Construction process(Jump hit):

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2025 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China