Products Center
More Products

Welfare is here! Kejia's "free patrol inspection plan" is open, and the start-up status value is full.

February 09, 2023

Free patrol inspection plan

No more worries about starting work in the New Year

The Lantern Festival has passed,“Year”It's getting farther away

After the holidays, the construction rhythm was restarted again.

Is your device ready for

What about the high-intensity work in the new year??

In order to make your power equipment with full score status value

Meet this year's engineering challenge

Atlas·Copco Power Technology Service Department launched

 Equipment“Free patrol inspection plan” 

Free!Get a full physical exam for your device!

Free patrol inspection plan

Our professional and technical personnel will personally take part in the work.,Perform a detailed inspection and analysis of your equipment,And give professional maintenance and repair advice combined with the inspection report.。Keep your equipment running at high performance levels in the new year,Achieve efficient production。

See details of the event here.!

Active object

All Atlas·Equipment of KPC Power Technology Department

Activity time

From now until March 31

“Patrol service package”Include

Professional technicians provide a test for your equipment

A written report shall be issued after the patrol inspection.

Provide maintenance and repair advice service according to equipment condition

Can't wait to sign up??

Click the button below.

Note the model and serial number of the equipment to participate in the activity

Picture

Sign up

Enter personal information and comment“I want a free patrol.+Equipment model and serial number”

  

 

Full body physical examination through the device

Effectively prevent sudden failure for you

Additional hidden costs of eliminating the unexpected

No more worries about starting work in the New Year!

 

Had a long New Year holiday.

Does your device suffer from holiday syndrome??

 Hereby, Xiao Ke will attach the device wake-up guide for you. 

 Follow the instructions to gradually wake up the device.~ 

Picture

Tips01

Picture

Air Compressor “Wake-up guide”

■ Check the battery voltage、Battery wire terminal;

■ Check and change engine oil、Compressor oil(If it has not been replaced for more than one year);

■ In the area with low temperature, it is necessary to check whether the diesel is waxed.;

■ Check whether the pipeline is frozen in the area with low temperature.;

■ Check the coolant level;

■ Compressor condensate drain;

■ Check the belt tightness;

■ Check the status of the emergency stop switch;

■ Power on and check whether the controller gives an alarm.;

■ Whether all kinds of pipes are normal;

■ Check whether the appearance is abnormal.,Are there any extra foreign bodies or small animals inside the equipment?;

Picture

 

 

Picture

Tips02

Picture

Engine “Wake-up guide”

 

■ Using a refractometer andPHMeter measurement,Test the condition of the coolant;

■ If necessary,Replenish or replace the coolant as soon as possible;

■ Check and adjust the brake system;

■ Visually inspect the wheel condition and tire pressure confirmatory test.;

■ Test the emergency stop switch;

■ Fuel injector test conditions;

■ Check the electrical system and cables;

■ According to the maintenance interval,Change engine oil and fuel filter;

■ Clean the equipment radiator;

■ Discharge、Clean the water and sediment in the oil tank;

■ Visually inspect the cable and harness for damage or looseness;

■ Check hoses and clamps for leaks or deterioration;

■ Check battery electrolyte level and voltage;

■ If necessary,Check and clean the battery terminal;

■ Check the main cable of the alternator and the connection points.;

■ Measure the insulation state of the Generator

Welfare+A bag of tricks,Double boost

Xiao Ke escorts your equipment in the Year of the Rabbit

I wish you all good luck in the Year of the Rabbit.!

LUCKY “Rabbit” YOU

Featured

more
Nuohao NKH135 Methanol Extended Range Wide-body Vehicle | Heavy-duty, High-efficiency, Worry-free Climbing Green Mine Tool

Nuohao NKH135 Methanol Extended Range Wide-body Vehicle | Heavy-duty, High-efficiency, Worry-free Climbing Green Mine Tool

  On the vast open-pit coal mines in Inner Mongolia,NKH135 mine car with its excellent performance and efficient operation ability,Become a beautiful scenery in the mining area.。The drivers praised one after another.:“This car works

Volvo's profitability was solid in the third quarter, trucks launched a new generation of safety systems, and construction equipment won China's Golden Wrench Award.

Volvo's profitability was solid in the third quarter, trucks launched a new generation of safety systems, and construction equipment won China's Golden Wrench Award.

01 Volvo Group Releases Third Quarter Report for 2024 Volvo Group Officially Announces Third Quarter Results for 2024。Market demand tends to be stable,Profitability remains robust。   Third quarter of 2024,Volvo Group in many r

The 2024 Annual Meeting of the Association's Excavation Machinery Branch, Accessories Branch, Industrial Internet and Data Branch was jointly held in Yantai

The 2024 Annual Meeting of the Association's Excavation Machinery Branch, Accessories Branch, Industrial Internet and Data Branch was jointly held in Yantai

October 30, 2024—November 1,With“Develop towards the new and high quality”As the theme“Excavation Machinery Branch of China Construction Machinery Industry Association in 2024、Belonging branch、Annual Meeting of Industrial Intern

Man Shengang, Party Secretary and Chairman of Shandong Heavy Industry Group, and Cao Huiquan, Secretary of Zhuzhou Municipal Party Committee

Man Shengang, Party Secretary and Chairman of Shandong Heavy Industry Group, and Cao Huiquan, Secretary of Zhuzhou Municipal Party Committee

November fourth,Party Secretary of Shandong Heavy Industry Group、Chairman Man Shengang went to Zhuzhou for investigation,Cao Huiquan, Secretary of Zhuzhou Municipal Party Committee,Deputy Secretary of the Municipal Party Committee、Mayor Chen Huiqing,Ch

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China