Before your equipment goes into production,
The equipment should be checked in detail.!
01 Pre-start check
1)Check the engine、Gearbox、Hydraulic tank、Check whether there is leakage in the liquid storage tank of the water tank and other parts,Observe whether there is leakage in the oil-gas-water pipeline.、Whether there is aging phenomenon。
2)Check the liquid level and oil in the liquid storage tank of each part.(Antifreeze、Urine aqueous solution, etc)Oil quality。
3)Check whether the lubricating grease of each part is sufficient.。
4)Check the tension of the track、Tire pressure, etc。
5)Check the cleanliness of the surface of the cylinder rod。
6)Check the fan belt、Generator belt、Rubber damping for belt and key parts of air conditioning Compressor、Whether the seal is aged。
7)Check the status of the air filter dust indicator。
8)Check the fuel tank and oil-water separator,Carry out drainage operation,Until the remaining liquid is pure diesel oil。
9)Check whether the instrument works normally after power transmission,Including water temperature、Oil temperature、Monitoring data of each level gauge and engine、Controller communication status。
Pre-start check
02 Check after startup
1)After the device is started(Restart the equipment after preheating when the ambient temperature is low),Observe whether the display of each instrument is normal.,Observe whether the operating parameters are normal.,Is there any alarm information?。
2)Idle operation 5-10 minutes,When the oil temperature rises to 40℃,Slowly operate the working device in situ,Make the lubricating oil of each part fully fill the key part,Cycle the handle for many times,And then put into production。
3)If the equipment is parked for too long,Travel at low speed and operate each work before carrying out load operation、Steering and brake handle for many times,Fully lubricate the equipment,Carry out load operation after confirming that all functions are normal.。
Check after startup
China Forestry Machinery Pioneer It has 17 years of research and development of forestry machinery、Manufacturing experience Guangxi Xuwo Engineering Machinery Co., Ltd. Will be on November 26.-29 Shanghai BMW showE4-579 Wonderful appear
November thirteenth,Accompanied by Vice General Manager Li Yongjie, the delegation of Zhongke Xinji Engineering Technology Co., Ltd. visited Fangyuan Group.。 Guests go deep into the production line of Fangyuan Group,Observe the production
Danasen is the world leader in hydraulic power conversion equipment,You are invited to attend from November 26 to 29, 2024,Held at Shanghai New International Expo Center BAUMA CHINA (Shanghai BMW Construction Machinery Exhibition)。 This exhibi
November thirteenth,Chairman-in-Office of Sany Group、President Tang Xiuguo led the team to Kunming, Yunnan,Visit to Yunnan Jiantou Group,Secretary of the Party Committee of the Group、Chairman Chen Zujun and his delegation held a discussion.。The two sid
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China