January 09, 2023
To cope with the impact of low temperature, rain and snow in winter,January 3,Yongcheng Rural Highway Management Office earnestly implements various measures for safe production,Actively do a good job in highway maintenance,To create a good traffic environment for the masses and passing Vehicles along the highway.。According to the actual highway maintenance work,,Standardize the daily maintenance inspection system,Further clarify the responsibility section of maintenance personnel、Detailed inspection standards,Take the daily work of maintenance personnel as the key point of inspection and assessment,Gradually improve the efficiency of daily maintenance operations。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China