Products Center
More Products

Comprehensive Strengthening of Highway Maintenance and Safety Management in Winter in Sanmenxia

December 06, 2022

For days,Municipal Highway Development Center focuses on the key points of highway maintenance in winter,Comprehensively and solidly do a good job in winter maintenance and management of ordinary highways in the city,Actively prepare for highway safety precautions in low temperature, snow and freezing weather。

One is to strengthen organizational leadership.,Compaction Work Responsibility。Convening a conference on the prevention of freezing rain and snow on highways,Leaders in charge of safety go deep into the front line,Emphasis is laid on the safety management of the new National Highway 310.,Demand persistence“Safety first”Principle,Concentrate on material and equipment allocation、Ice and snow removal operation,Regularly check the implementation of smoothness measures、Contingency plan execution、Use of material reserves、Safety production guarantee and other work。

Second, strengthen the investigation of hidden dangers.,Implement preventive measures。Increase the pair of sharp corners、Inspection frequency of key road sections such as steep slopes,In particular, timely organization of personnel to the new National Highway 310、National Highway 209、Provincial Highway 244 and other key routes are continuously inspected.,Improve the marking of key road sections、Signs and protective facilities,At the bridge、Curves、Accident-prone and other key sections,By honking、Warning such as flashing warning lights and variable information boards along the line,Remind drivers and passengers to slow down。

Third, strengthen preventive maintenance.,Improve the road appearance。Investigate the pavement disease,Efficient disposal,Ensure timely repair of damaged pavement。So far,25390 square meters of pavement disease disposal has been completed.。In addition,For low temperature in winter、Dry climate and so on.,Focus on green seedling pruning、Management and protection, etc,Formulate the scheme of winter seedling overwintering,Scientific replanting、Management and protection of seedlings,Ensure the greening effect。

Fourth, strengthen material reserves.,Improve emergency response capability。Organize emergency rescue teams in advance、Snow removal TruckExcavator、Loader and other personnel and equipment,Scientific storage of anti-slip material、Industrial Salt、Shovel、Pickaxe and other emergency supplies,At the same time, organize personnel to strengthen the sharp bends and steep slopes in the jurisdiction.、Grow up downhill、Road condition supervision of key sections such as ice-prone sections,Timely supplement the anti-skid sand materials stacked on both sides of the road,Stack neatly。

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China