Products Center
More Products

Atlas Copco: Go, go to the scene! How about the field application of "Non-road Country IV"?

December 02, 2022

December means a lot to engineering people.

Off-road mobile machinery“Guo Si”Formal implementation

Entering the New Era of the Fourth National Congress

Starting from the Renovation of the Engineering Industry!

Kejia's fourth national air Compressor has gone through the polar test.

Also at various project sites,Show off your skills!

It has been tried on the spot,Ke fans say so.:

“ 

Choosing Kejia for the Fourth National New Machine

The engineering field is completeholdLive

Facing the power demand in different fields

Optional National IV Air Compressor

WantSufficient power、High efficiency、Low energy consumption、More reliable

Go,Visit the project site with Xiao Ke

See How the Fourth National Air Compressor Wins the Recognition of Ke Fan

Flying sand and stones,Conquer the top of the mountain

 

Visit log

Project location

A quarry in Yunnan

Engineering field

Quarry blasting

Application requirements

Aperture:115mm、Hole depth:9m

Running time

9h/God


Xiao Ke's first stop is a quarry in Yunnan.,The soil in the mining area is soft and remote.,Equipment is inconvenient to get in and out,The task is tense,Drilling and blasting work shall be carried out continuously,Therefore, there are extremely high requirements for the stability of the equipment.。Customers had some concerns at the beginning of the trial of the fourth national air compressor.。

  

Full load operation at the equipment site is about 400hAfter,With zero failures.,It has been recognized by customers.。

The equipment not only has a large gas volume,、Fast footage speed,Fuel consumption is also basically the same as that of the third national aircraft.,The newly added post-processing system can be operated according to the intelligent prompt.,Save both worry and effort!

Coincidentally

Xiao Ke came to a quarry in Zhejiang.

Although application requirements are different

Customers are still full of praise for Kejiaguo No.4 Air Compressor

Visit log

Project location

Site of a quarry in Zhejiang

Engineering field

Quarry blasting

Application requirements

Aperture:115mm、Hole depth:17m

Running time

8h/God

At a quarry site in Zhejiang,The aperture of that open hole is also 115.mm,The hole depth needs to be increased to 17m,To ensure the pore-forming quality,Higher compressed air and pressure values are required,After 8h/Days of full load operation,Kejiaguo No.4 Air Compressor Wins Customer Recognition Again:

Kejiaguo Fourth Air CompressorFuel consumption is basically the same as that of Youshang's fuel-saving machines.,And that work efficiency is about 14.%。

 

Photovoltaic industry,In the desert“Plant the sun”

Visit log

Project location

Photovoltaic construction site

Engineering field

Drilling device

Application requirements

Aperture:250mm、Hole depth:1m

Running time

8h/God


At high altitude、Photovoltaic construction site with undulating terrain,Equipment not only needs to meet gas demand,More need for stable performance to cope with harsh environments,While controlling costs, we should also pay attention to energy conservation and emission reduction.。

Kejiaguo No.4 Air Compressor at 4500mAt high altitude,Tested in the field by big dust,It can fully cope with complex working conditions.。And is resistant to cold,Grams of high temperature,At-25℃~50℃It can be adapted to all working conditions.。Customer site feedback:

And that equipment efficiency is high,Sufficient in tolerance,On-site operation: about 400hAfter,There are still zero failures,Very reliable,Follow-up consideration also starts with a national fourth air compressor.!

Dig a stone into gold,No fear of mines“Tough bones”

Visit log

Project location

A copper mine mining site in Jiangxi

Engineering field

Copper mining

Application requirements

Aperture:200mm、Hole depth 12m

Running time

8h/God


In the copper mining project,The daily mining volume is large、And that work intensity is high,People are off the plane endlessly,This greatly tests the comprehensive performance of the air compressor.。Ke Jiaguo's fourth air compressor arrived at the scene.,Delivered full load operation 700hBrilliant achievement of zero failure,Get customer praise。

High efficiency,Low fuel consumption is the unique advantage of Kejia.,The worse the geological conditions are.,The advantages are becoming more and more obvious。It has been tried on the spot,When the fuel consumption is basically flat,Kejiaguo No.4 air compressor has stable pressure、Large volume of gas、Ood slag discharge effect,You are indeed a power expert.!

  

Drill into rock,Build a sharp tool for pile foundation

Visit log

Project location

Pile foundation site in Northeast China

Engineering field

Pile foundation drilling

Application requirements

Aperture:800mm,Hole depth:25-30m

Running time

Duration 8-10h/God


On the last leg of the visit,Xiao Ke came to a pile foundation site in Northeast China.,This time, the demand for hole formation is higher than before.。Aperture 800mm,Hole depth 25-30m,Two sets of Atlas are used on site.·Parallel air operation of the fourth air compressor of Kupu Keguo,In duration 8-10h/Days of long-term operation,The performance is stable,Its integrated design is compact in structure.,It can effectively help customers reduce fuel costs

 

 

 

Low fuel consumption、Large volume of gas、The operation is stable

Intelligent post-processing system is easy to operate

……

The Ke family's intentions are evident in the details.

And that's just part of our many application cases.

More application scenarios in engineering subdivisions

Stay tuned!

The fourth non-road country has been formally implemented.

Create a Sustainable New Project with Kejia

Do you have any doubts about the new machine of China IV?

Click the button below to contact us

Ke's engineer will give you a one-to-one answer.~

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China