According to the Indian mediaIndia InfrahubNews,Recently,XugongXGC150-IA Overseas key projects with Crawler Cranes——India's longest sea-crossing bridge (MTHL)The project schedule has passed 84%,It is expected to be completed by the end of 2023.。
The total length of the bridge is 21.8 kilometers,Includes 16.5 km of sea bridge and 5.5 km overland viaduct,After completion,It will reduce the commuting time between Mumbai and Navi Mumbai from the current 2 hours.Reduced to 20 minutes,Let the two places flow、Logistics、The flow of funds is gathering rapidly,Promote local economic development。
The Indian side is rightMTHLThe project is highly valued,Since the commencement of construction,With the increasing investment,,For lifting equipmentLifting capacity、So are handling performance and transportation requirements.“A rising tide lifts all boats”。
Since entering the project,XugongXGC150-IA Has been playing a powerful role in multiple advantages.,Steady progress of the project,Win praise from users。
01Heavy and powerful:XGC150-IAMaximum lifting capacity 150t,Main pump、Main Valve、The winch motor can be equipped with imported brands.。02Transportation is global and worry-free.:XGC150-IATransport width≤3m,Single piece weight≤29t,Meets global shipping requirements。03The operation is efficient and stable:XGC150-IAThe luffing system adopts duplex drum.,The luffing speed is further improved.,Main and auxiliary hooks can be switched by one key,Quickly adapt to multiple construction scenarios。
Fast working speed and reliable service, that's why we expanded our fleet with a new XCMG XGC150-IA craler crane.
Person in charge of field equipmentBiblabMr. Wang said,The equipment works efficiently、The service of XCMG is reliable,This is our choice.XGC150-IATo expand the device array。
Since the start of planning in the 1970s,,MTHLThe project has gone through several attempts to build,But without success.。Construction started in 2018.,MTHLThe construction progress of the project is steadily advancing.,Traffic is in sight。XCMG presses the accelerator key for project construction with high-quality products,Helping India Build the Project of the Century。
There is still time before the opening of the exhibition. 11 God! bauma CHINA 2024 pre-registration channel has been opened so far.,Domestic and foreign buyers' enthusiasm for the exhibition continues to ri
November 12,The Third Enlarged Council Meeting of Tianjin Concrete Industry Association and Environmental Protection Leading Enterprise Policy Publicity Meeting were successfully held in Tianjin Jinnan 1958 International Hotel。Shantui Jianyou participa
November 13, 2024-The 15th,“East China Sea Forum-The 4th China Sandstone High Quality Development Summit”Successfully held in Huzhou, Zhejiang。 As a leading enterprise of new energy construction machinery,Jingong New Energy was invited
13-21 November,President Xi Jinping will attend the 31st APEC Economic Leaders' Meeting in Lima. Peru Make a state visit、Attend the 19th G20 Summit in Rio de Janeiro andBrazilMake a state visit。 A person of common aspiration Don't tak
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China