November 09, 2022
A plan for a thousand years、Century Xiongan。To build a green Xiongan.、Wisdom Xiongan、Innovation Xiongan,Sany Heavy Industry Goes to the Appointment of the Times,Relying on“The four highest”Design objectives,Plan、Design、Construction of Xiongan No.3(In the village)Mixing plant,Contribute wisdom to the construction of Xiongan。The construction period of 196 days is the fastest in Xiongan.、The capacity is 3 million square meters/The largest scale in a year,Occupying an area of 11.620,000 square meters,Gross Floor Area 4.90,000 square meters,The equipment covers an area of 3.60 thousand square meters,The largest amount of creation,“Century Station”Came into being。
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2022/202211/2022110917124799.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
April 28, 2026,Cummins Generator Technology(China)Ltd(Hereinafter referred to as:CGTChina)30th anniversary,and the new product launch celebration was grandly opened in Wuxi。Cummins relevant leaders,Some customers、Partners and employee representati
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China