Products Center
More Products

Tuanjie Town of Da'an District Takes Multiple Measures to Strengthen Highway Maintenance in Autumn

November 01, 2022

In the near future,Tuanjie Town of Da'an District Seizes the Golden Season of Highway Maintenance in Autumn,Combined with the characteristics of highway maintenance in autumn,Take various measures simultaneously,Carry out autumn maintenance of rural roads in an all-round way,Build safe and convenient travel for the masses“Chang、Jai、Green、Beauty、Ann”Traffic environment of rural roads。

Strengthen the investigation of hidden dangers。According to“Prevention first、Combination of prevention and treatment”The principle of,Keep a close eye on the outstanding problems and weak links of road safety,Organize personnel to focus on inspecting the bridges of rural roads in the whole town、Slope、Sharp bends and steep slopes、Safety risk and accident hidden danger of the section near water and cliff,Protruding bridges and culverts、It is easy to be damaged by water、And is easy to landslide、Rockfall prone sections and other key parts,Take prompt measures to solve the potential safety hazards found in the investigation.,Make sure the road is clear。Since October,Six hidden dangers of rural highway safety were identified.,Five rectifications have been completed.。

Strengthen disease control。Based on the data of hidden danger investigation,Around Baotong、Keep smooth、Cleaning“San Bao”Aim,Adopt artificial maintenance mode,Comprehensively promote the treatment of highway diseases、Road cleaning、Shoulder renovation、Cleaning of side ditch、Bridge and culvert dredging、Infrastructure maintenance and other work。Since October,Clear 2 culverts,Renovate 50 meters of road shoulder、The side ditch shall be cleared for 100m、Pavement maintenance 300m。

Timely daily maintenance。Arrange personnel to manage the road section from time to time、Careful inspection of bridges,Pavement and side slope、Side ditch、Weeds in gutters, etc.、The accumulations shall be cleaned up in time.。Since October,A total of 10 kilometers of roads were cleared.,Weed clearing 4 km、2 fallen and broken branches,Clear the side ditch for 200m,Remove 10 square meters of road surface accumulation。(Zhang Ke)

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China