Products Center
More Products

More than half of the girder erection project of the inter-city railway along the Yangtze River in the south is introduced from the high-speed railway along the Yangtze River in the north

October 18, 2022

Yu Rong(North along the river)The high-speed railway has been introduced into the South Riverside Intercity Railway, and 60% of the girder erection work has been completed%。

There are 119 box girders in the project.,Includes 113-hole precast beam and 6-hole cast-in-place beam,At present, the main task is the girder erection of the connecting line.。The project department is making every effort to speed up the construction.,According to“At least 2 beams per day”The speed of advance,Ensure that the girder erection tasks of all four tie lines are completed by the end of November,Prepare for the construction of the bridge deck system in the next stage。

Shanghai, Chongqing and Chengdu(North along the river)The project of introducing high-speed railway into the South Riverside Intercity Railway is close to the Shanghai-Suzhou-Nantong Railway in Taicang City and the South Riverside Intercity Railway under construction.,Including 4 connecting lines:Shanghai, Chongqing and Chengdu are introduced to the south and go up along the Yangtze River.、Downlink tie line,South along the Yangtze River into Shanghai-Chongqing-Chengdu upstream、Downlink tie line,As well as the south main line along the river to switch.,Construction of a total of five lines,Total length of bridge3.7km。

(Suzhou Railway Office)

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China