October 14, 2022
October thirteenth,Published on the official website of Henan Provincial Department of Transportation《Reply on Construction Drawing Design of Main Works of Lankao-Fengqiu Section of Lankao-yuanyang expressway Project》。
It is understood that,The starting point of Lankao-Fengqiu Section of Lankao-yuanyang expressway is located in the southwest of Guying Town, Lankao County.,Set up Lankao North Hub Interchange and Rilan Expressway Intersection,The destination is Baiyangsi Village, Pandian Town, Fengqiu County.,Set up Pandian Hub Interchange to intersect with Daguang Expressway,Connect to the Fengqiu-yuanyang Expressway under construction,The total length of the route is 30.263 kilometers。The main line adopts the technical standard construction of two-way six-lane expressway.,Design speed 120 km/Hour。
According to the content of the reply,The construction drawing budget of the main project is approved as the 632751..80 thousand yuan,Among them, the cost of construction and installation is 469581..50,000 yuan。
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2022/202210/2022101409021336.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China