October 10, 2022
July-In September, Changlin Company carried out on-site management responsibility promotion activities.。Full participation of all departments,Detailed planning,On-site management is carried out in three stages.,The first stage is to implement the responsibility of contracting.,Optimize logistics management;The second stage is to standardize the fixed site.,And that operation efficiency is improve;The third stage is the visualization of fixed management.。


On-site management promotion activities not only extend the coverage of OEM products“Material to Locator”、“Material to station”Fixed management standard,Realize more material collection、Hair、Accurate and efficient operation。



Now,Changlin Production Operation Site 5S Material storage specification、The scene environment has taken on a new look.。
In the future,Changlin will continue to promote the phased goal of on-site improvement.,Continuously integrate lean management concepts and methods into daily work。
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China