October 09, 2022
September twenty seventh,With the sincere cooperation of all departments,,The orderly delivery Vehicles drove out of the factory area of Building Materials Machinery Co., Ltd.,The product delivered this time is the cement silo urgently ordered by the user.。
September twenty sixth,Fangyuan Group Building Materials Machinery Co., Ltd. receives orders from usersSCContract for 150 Cement Silos,Require delivery the next day after receiving the order。Facing urgent production tasks,The company responded quickly,Urgently mobilize elite troops for assault production,Non-stop operation for 24 hours,Ensure that the products are delivered on time within the specified time.,The first time to meet the needs of users。
Wang Xinjun and Yu Huijun
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China