Products Center
More Products

East China Power Grid Giant "Charging Treasure" Is Coming! Liugong helps the largest pumped storage power station in East China!

September 20, 2022

“ On the morning of September 15th,Zhejiang Jiande Pumped Storage Power Station Preparatory Project Commencement Ceremony Held in Meicheng Town。

The fourth new machine of the country is on the stage

By the Fuchun River,Construction of Jiande Pumped Storage Power Station。Several Liugong Excavators are ready to go at the scene.,As the flagship model of Liugong Excavator, 920E,It enjoys a good reputation in the industry for energy saving and fuel saving.。Widely used in old house demolition,Airport construction,Real estate construction、Paving of roads,Canal construction and other projects。

● 920FG4 Make a stunning appearance

But the most eye-catching is the new model of Liugong Excavator.920FG4Shine on the stage。Its comprehensive performance strength has reached the advanced level of similar products.,It will bring more excellent investment returns to customers with super high cost performance.!

● Site of commencement ceremony of preparatory works

It is reported that the power station covers an area of about 161.44 hectares,The total investment is 14 billion yuan.。The project plans to build six 400000 kilowatt pumped storage units.,Total installed capacity 2.4 million kilowatts,The designed annual power generation capacity is estimated to be 2.4 billion kWh.,3.2 billion kilowatt-hours of water and electricity pumped annually。

  

Jiande Pumped Storage Power Station is also the largest pumped storage power station in East China.,It is also the largest investment project in the history of Jiande City.。The power station has been listed in the National Energy Administration.《Medium and long term development plan of pumped storage(2021-2035)》、“Fourteen five”Key implementation projects,It is planned to generate electricity in 2029.。

  

Its construction has important demonstration significance for the construction of pumped storage in China.,It will further optimize the power supply structure of East China Power Grid.、Relieve the peak regulation pressure of power grid,Enhance the safety of power system operation、Reliability,Yes, to defend the country“Five major security”Will play a positive role。

  

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China