September 19, 2022
“ On the morning of September 15th,Zhejiang Jiande Pumped Storage Power Station Preparatory Project Commencement Ceremony Held in Meicheng Town,On-site Liugong 920EExcavator and the fourth national new product——920FG4 Excavators and other equipment lined up neatly,Help the project start smoothly。”

Jiande Pumped Storage Power Station is the largest pumped storage power station in East China.,It is also the largest investment project in the history of Jiande City.。The power station has been listed in the National Energy Administration.《Medium and long term development plan of pumped storage(2021-2035)》、“Fourteen five”Key implementation projects,It is planned to be put into operation in 202。

The project covers an area of about 161.44 hectares,The total investment is 14 billion yuan.,Six 400 thousand kilowatt pumped storage units are planned to be built.,Total installed capacity 2.4 million kilowatts,The designed annual power generation capacity is estimated to be 2.4 billion kWh.,3.2 billion kilowatt-hours of water and electricity pumped annually。

The construction of Jiande Pumped Storage Power Station has important demonstration significance for the construction of pumped storage in China.,It will further optimize the power supply structure of East China Power Grid.、Relieve the peak regulation pressure of power grid,Enhance the safety of power system operation、Reliability,Yes, to defend the country“Five major security”Will play a positive role。

The fourth new machine of the country is on the stage
920 who participated in the commencement of the projectEIt is the flagship model of Liugong Excavator.,It enjoys a good reputation in the industry for energy saving and fuel saving.,Widely used in old house demolition,Airport construction,Real estate construction、Paving of roads,Canal construction and other projects。Engineer Liu 920FG4. The comprehensive performance strength of Excavators has reached the advanced level of similar products.,It will bring more excellent investment returns to customers with super high cost performance.!
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China