September 11, 2020
In the face of the outbreak that has not yet ended and may rebound, how to resume production as soon as possible to achieve; Two not mistake & throughout; & other; Double promotion & throughout; , is the difficult problem that current enterprise seeks to break through.
new fuxia railway project department USES scanning qr code, url link, nail three ways to enter the construction personnel registration. Map of SAN fuk sha railway project department
With the help of big data, the newly-built fuxia railway, a national key construction project, successfully resumed construction as soon as possible while doing a good job in epidemic prevention and control.
The department of the newly-built fuxia railway project of China railway no.6 engineering group co., LTD said Wednesday that its online statistics system for returning employees has helped companies resume work as soon as possible with the help of big data.
The builders of the newly-built fuxia railway come from all over the country. In order to know the whereabouts of the staff, the project department requires the staff returning to work to scan the designated qr code before entering the site to determine the whereabouts within 14 days and properly deal with the staff from the key epidemic areas.
After the first level, then scan qr code, link, nailing three ways for registration, fill in personal information, return time, and a history of close contact and online signature confirmation, automatically generating the return staff personal information form, avoid written to fill in, collection, summary contagious infection, may cause a sharp to improve the efficiency of collecting master back personnel information, and realize the return information sharing.
The admission personnel fill in the health registration card online every day, and the system will automatically alarm the abnormal personnel to realize real-time monitoring and timely disposal.
Guo xiaoting, executive deputy manager of the project department, told reporters that every day with a click of the mouse, you can understand the data of the day's staff on duty and the accumulated data and health status, to achieve easy control, according to the construction deployment.
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China