"Fawn" return to work "quarantine" guidance

August 24, 2020

Return to work & other; Quarantine & throughout;

Thanks to the joint efforts of the whole nation, the epidemic has been effectively controlled and continues to develop in a better direction. After the outbreak, “ The deer & throughout; The Excavators were coming back from their long hibernation. Although full of effort, before you start, please take the time to give your patience. The deer & throughout; Prepare & other; Quarantine & throughout; To go into battle again. Don't be reluctant to give up this time, efficiency is to pursue, security needs to be guaranteed.

01
Full sterilization

Just experienced a nationwide epidemic, it is recommended to first of all on the outside of your Excavator and driver room for a comprehensive disinfection;

Appearance patrol
02

· is there any bump deformation of all surface coverings
0 is there any damage or absence of surface parts
● is there any sign of collision/cracking in the structural parts such as the big forearm


· is there any damage to the electrical components
· whether there is any foreign body, loose or deformed on the surface of each chassis part
· is there any foreign body in the engine compartment
· whether there is any foreign body on the surface of the radiator
· crankcase ventilation duct is blocked or bent

03
Check

before starting

Engine oil level
0 coolant level
Glass water level
Belt tightness
Hydraulic oil level
Gear oil oil level
Fuel tank and oil-water separator drainage
Air filter element inspection
Inspection of internal/external circulating filter element of air conditioner
Battery voltage confirmation
Check the strain of track

check the lubricating grease of turning support/turning gear ring Grease

at each lubrication point of the forearm



Operation check
04

· idle for 5-10 minutes, check whether there is fault code and whether engine sound/smoke color is normal
· test whether the horn, working light and air conditioning system work normally
No-load mining and loading cycle 3-5 times, check whether the operation of each working part is smooth, there is no difference
· hold up the left and right side tracks in turn, rotate 1-2 laps respectively in the forward/backward directions, and check whether the chassis parts are abnormal during the operation

check if there is any leakage after the machine is shut down

& other; The deer & throughout; After a comprehensive “ Quarantine & throughout; Finally, we can start to put our hands and feet into the new project construction. If you are in the “ Quarantine & throughout; If you find any problems in the process, please contact our local dealers in time. Our dealers, like you, are ready to try. They will provide you with timely and professional services to escort your equipment.
& have spent

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China