August 19, 2020
In the early stage of a large number of preparatory work, and invited professional institutions for a comprehensive system of training, fangyuan group has resumed production work is steadily advancing.
On February 22, some production enterprises resumed production, and all units strictly implemented the arrangement and deployment of fangyuan group's leading group for epidemic prevention, made solid preparations for and training related to epidemic prevention, established isolation rooms, published editions, equipped with materials and materials, and strengthened guidance and guidance, so that epidemic prevention work and production work were closely integrated.
On the morning of that day, each employee passed the company's gate and had his/her temperature measured. After passing the measurement, he/she could enter the factory and receive relevant training.
Through the continuous strengthening of management process, effectively promote the in-depth epidemic prevention work, and lay a solid foundation for the group to resume work one after another.
& have spent
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China