August 07, 2020
Link-Belt ConTractor Handling Grapples are designed for waste handling and recycling, Material Handling and sorting on construction and demolition sites, and primary demolition tasks.
The models in the new LCG Series come with either perforated or heavy-duty ribbed tines that close at a flat angle to assist in compacting material, the company says. “Maximum crushing force densifies material while the strong rotation system resists back-driving forces.”
Features on the grapples include:
Single cylinder with dual drag links, for a minimal moving parts and a simplified hydraulic system.
Streamlined tine, frame and linkage design with easy-to-locate grease fittings.
Oversized cylinder design that incorporates rod protection, crushing force, bolt-on gland cap for durability, and easier maintenance.
Large recessed side covers for easy access to internal components and cover fastener protection.
Models in the LCG Series are as follows:
LCG 75 – for Excavators of 15-22 metric tons; 0.75-cubic-yard capacity.
LCG 100 – for Excavators 20-29 metric tons; 1-cubic-yard capacity.
LCG 125 – for Excavators 25-38 metric tons; 1.25-cubic-yard capacity.
According to the statistics of China Construction Machinery Industry Association on the main manufacturing enterprises of excavators,In April 2024, 18822 of various excavators were sold.,Year-on-year growth of 0.27%,Among them, domestic 10782 station,Y
According to the statistics of China Construction Machinery Industry Association on the main loader manufacturing enterprises,Sales of 9779 loaders of various types in April 2024,Year-on-year growth of 0.89%。Among them, 5309 units were sold in the dome
Recently,Zoomlion Intelligent High-altitude Machinery Spring and Summer New Technology Conference was held in Zhonglian Intelligent Industrial City High-altitude Machinery Park,At the meeting,Zoomlion has officially released a new generation of distrib
Recently,Under the hoisting of Zoomlion 2000-ton crawler crane,The first module of the containment steel lining of the reactor building of Unit 3 of Hualong One Zhangzhou Nuclear Power Plant was successfully put in place.。This is the raft foundation po
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China