August 03, 2020
Epidemic prevention and resumption of work are two things. Plague & throughout; Don't give up your responsibilities. On February 15, more than 60 employees of ningdong railway project department of no.2 company of China railway 23rd bureau group, while strictly implementing various prevention and control measures of the epidemic, completed 11 kilometers of line maintenance and construction on the same day, opening the prelude of the comprehensive resumption of the project. Up to now, has realized the unusual period staff not to have the infection epidemic situation, the field construction proceeds in an orderly manner the goal.
The ningxia hui autonomous region ningdong railway industrial and electrical equipment maintenance project is located in lingwu city, ningxia hui autonomous region. It is a state-level energy and chemical industry, mineral demonstration and grain production and processing base. In order to meet the demand for increased railway traffic after the holiday, more than 20 employees took the initiative to return to work in advance at the end of January. A spearhead & throughout; The burden of.
With one hand, we will resume work and prevent epidemics. In order to reduce the risk of epidemic infection, the project department implemented closed management, equipped with sufficient protective equipment such as masks, alcohol and disinfectant, assigned personnel to take temperature of all staff every day, disinfected public areas, and adopted a separate dining system in the canteen to avoid cross-infection from the source.
& other; During the Spring Festival, the left-behind staff of the project department stood at the foot of helan mountain and carried out line maintenance operations in the chilly wind every day, making a contribution to the safety and stability of ningdong railway transportation production during the festival. At present, we insist on resuming work, epidemic prevention, two hands, two not wrong, not only to ensure the health of workers, and to ensure the site construction in an orderly manner. To this end, the owner specially called my company for the project department work thumb up. Throughout the &; Zhao jingxin, deputy project manager, said with relief.
The picture shows the scene of the workers' on-site maintenance line.
(Yang jing shuang wei zhaojun)
China Forestry Machinery Pioneer It has 17 years of research and development of forestry machinery、Manufacturing experience Guangxi Xuwo Engineering Machinery Co., Ltd. Will be on November 26.-29 Shanghai BMW showE4-579 Wonderful appear
November thirteenth,Accompanied by Vice General Manager Li Yongjie, the delegation of Zhongke Xinji Engineering Technology Co., Ltd. visited Fangyuan Group.。 Guests go deep into the production line of Fangyuan Group,Observe the production
Danasen is the world leader in hydraulic power conversion equipment,You are invited to attend from November 26 to 29, 2024,Held at Shanghai New International Expo Center BAUMA CHINA (Shanghai BMW Construction Machinery Exhibition)。 This exhibi
November thirteenth,Chairman-in-Office of Sany Group、President Tang Xiuguo led the team to Kunming, Yunnan,Visit to Yunnan Jiantou Group,Secretary of the Party Committee of the Group、Chairman Chen Zujun and his delegation held a discussion.。The two sid
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China