Products Center
More Products

Not the same peak season | outbreak in the former lei wo people "retrograde" up

July 09, 2020

Current outbreak,
Levo heavy industry two hands, two not wrong.
Quick response, scientific scheduling, multiple measures,
Ensure production safety and order during epidemic prevention and control.


Measuring temperature

Levo has established a scientific and orderly epidemic prevention and control system based on the linkage of the upper and lower levels, mass prevention and treatment, and put the safety of employees' lives and health first. Efficient deployment and implementation of disinfection and preventive measures to ensure the timely procurement and distribution of anti-epidemic materials such as masks and disinfectants.

At the same time, the restaurant adopts the system of serving meals at different times to reduce personnel gathering. Just to make the epidemic prevention and control network stronger and safer.




someone is responsible for disinfection

every day

The disease waits for no man, the time waits for no man. Lewo people stick to their posts, clear division of labor, efficient coordination, work with one heart and one mind to ensure smooth and orderly production and operation.





Workshop production

Outbreak before
Ray wo man & other; Retrograde throughout the &; And on
All hands count, all hands count.
& other; Pull out all the stops. Race against time
Joint war & other; Service & throughout; Looking forward to spring flowers.

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China