Products Center
More Products

More than 2,000 people from the China construction fifth bureau participated in the construction of the wuhan Raytheon mountain hospital and other medical and epidemic prevention projects

June 28, 2020

On February 7, the wuhan Raytheon mountain hospital, which was built with the participation of China construction fifth engineering group, was inspected and handed over gradually. Since the outbreak of the epidemic, csc5 has undertaken the construction of more than 10 medical and epidemic prevention projects in hubei, guangdong, henan, shaanxi and hainan, with more than 2,000 people working in the front line.

On January 31, China construction 5th engineering group no.3 company, installation company, civil engineering company and other units sent a team of more than 700 people to support the construction of wuhan Raytheon mountain hospital. This batch of providers are mainly electrical, water supply and drainage, hvac and other professional management personnel and key technical workers, whose responsibility is to speed up the completion of the hospital mechanical and electrical installation task, to promote the smooth delivery of the project. On February 7, the mechanical and electrical installation of the two medical security buildings contracted by the fifth bureau was completed and accepted as scheduled.

In guangdong, China construction no.5 south China company has invested in the construction of temporary epidemic prevention hospitals in guangzhou, shenzhen, dongguan and zhongshan for the first time. The total construction area of the hospitals is over 40,000 square meters, and it is expected to accommodate more than 1,500 beds, which will effectively relieve the pressure of patients in guangdong. In which 2000 square meters of board room, can accommodate 200 beds “ The spare ward project for prevention and control of the new epidemic in dongguan ninth people's hospital ” After 7 days of construction, it was put into use on January 30.

In henan, China construction five henan company is advancing rapidly. New epidemic prevention ward of anyang fifth people's hospital ” In the construction. The total construction area of the project is 5166 square meters, with a total of 176 designed rooms, including 112 wards. Since the construction started on January 31, the box-type board house of the project has been basically assembled. More than 500 workers on the site are facing the wind and fighting the snow, and are carrying out the interior decoration work. The installation of water, electricity, ventilation, fire control, air conditioning and other equipment has been carried out in full swing, the total progress of the project has been completed 80%.

Featured

more

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China