Products Center
More Products

Leisha service personnel who accompany us to fight against the epidemic and escort the prevention and control of the epidemic

June 22, 2020

Where there is a need, there is reza!

In order to better control the epidemic, following the construction of wuhan vulcan mountain and Raytheon mountain hospital, many parts of the country have also referred to the ldquo; Xiaotangshan & throughout; Models are being built one after another. The nation has a call, a mission. In recent days, reza equipment and service officers and men have been fighting in the nation's epidemic line, unity, full power to support the construction!

On February 1, construction of the isolation ward began at the hospital of molongquan town, Qingdao, shandong province. Leisha invested two cranes to build the integrated board room for the isolation room. Two cranes work at the same time, lifting equipment 48 hours without stop, effectively completed the hospital construction work of two days.

Resa equipment in the implementation of emergency construction tasks, while the staff are not idle, have their own way to participate in the civil war. Plague & throughout; In the middle. the efficient completion of the task of the isolation ward in Qingdao cannot be separated from the on-site support of the service personnel of resa.

& have spent & have spent

the responsibility of assisting the construction of Qingdao isolation hospital is heavy, and the project is urgent, so it is very critical whether the equipment can work normally. Therefore, after the service staff learned that the local crane customers to participate in the hospital construction, service manager pan lishong led the service engineer MAO xiaolang and service manager gao yinbo of Qingdao ruihai service station, the first time to the construction site, a day in advance for the customer Vehicle maintenance. Starting from the details, we have tested whether the force device is normal, whether the Vehicle turns, whether the stretching action is normal, whether the pressure is normal, whether the chassis drive is normal, whether the arm slider is grease lubricated, whether the warm air work is normal and so on, so as to ensure the good stability of the lifting equipment in operation.

Shandong regional service manager pan lisong

& have spent & have spent

Shandong regional service engineer MAO xiaoliang

& have spent & have spent

Shandong Qingdao service manager gao yinbo

& have spent & have spent

hoisting equipment has not been shut down for 48 hours, and it has been working efficiently and intensively. During the 48-hour operation of the equipment, the service team led by pan lishong, a service staff member, also stuck to the equipment side for fear that problems with the equipment would affect the construction period. in addition, he has prepared all aspects of the work to ensure that the hospital construction is running smoothly. This included preparing medical supplies in advance, delivering protective equipment such as masks, disinfectants and gloves to crane drivers on site, preparing lunches and dinners, and providing oil and filters to ensure the equipment worked.

Rezai service manager to give support, customer DE Yi bonanza industry (Qingdao) look in the eye, Thanksgiving heart, and said,

During the construction of the hospital during the Spring Festival, thanks to the company of reisa, to ensure the normal operation of the equipment, the hospital construction can be effectively completed.

It was a silent affair. Fight disease & throughout; This is a concerted effort.

Racing against the clock and fighting against the epidemic, the front-line operation personnel and service personnel of resa heavy machinery anti-epidemic engineering will work hard day and night to build a protective wall for the safety of people all over the country! & have spent & have spent & have spent & have spent & have spent & have spent & have spent

Service management department & NBSP; Chen Jie

Construction Machinery Online

Language Options

E-Mail: alina@global-ce.com TEL: 0086-10-84673349 FAX: 0086-10-84673349
Site: International - China - U.S.A - Russia - France - Spain - Portugal - India - Germany - Saudi Arabia - Indonesia

Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China