April 29, 2020
On January 10, with the successful casting of the last concrete, fengting no. 1 of hanghai east road station in section 08 of zhengzhou metro line 4, which was constructed by the company, successfully completed the capping of the main structure.
It is reported that the hanghai east road station is located at the intersection of hanghai east road and tengfei road in zhengzhou city. + & throughout; Type change. The station is designed to be a 14-meter double-column-island structure with three underground floors. The station length is 185.5m, the standard section width is 23.1m, and the platform width is 14m. There are two entrances and three groups of wind pavilions.
Correspondent: meng fei
ACE Group Invites You to the 140th Canton Fair As golden breezes bring crisp autumn air and the fragrance of osmanthus drifts through the air, the 140th China Import and Export Fair (Canton Fair, Autumn Session) arrives as scheduled. Known as "Chi
ACE Group successfully concluded its three-stop September exhibition tour: Mining Indonesia (Jakarta), MiningWeek & MinePro 2026 (Ulaanbaatar) and Paving Expo (São Paulo), showcasing mobile crushing stations, BAP200+RAP80 asphalt plants and mining excavat
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China