April 09, 2020
& quot;
Zhashui county, located in the south of shaanxi province, is located in the southern slope of the qinling mountains, where the mountains and rivers are beautiful, the air is fresh, and the industrial pollution is small. Natural medicine bank" . There are 37 kinds of metallic and non-metallic minerals with mining value, and the mineral reserves of caltrop iron in 213 ore deposits are 302 million tons, accounting for about half of the province. Silver and lead reserves rank the second in China. The daxigou deposit is a multi-mineral ore field with the highest iron deposit in the province and the second highest silver and copper deposit in the country. It is known as the future large iron and steel base of shaanxi province.
General manager fan company is located here, was established in 2005, the company has three levels of mining construction general contracting qualification, mainly engaged in mining engineering construction, traffic tunnel, underground engineering facilities installation, mining engineering, mining products processing. At present, the company has a number of equipment on the mine, six of which are John Deere.
& quot;
Manager wang of the project department said: Company this decade has bought a lot of brands of Excavators, favorite or John Deere products, because of bad working condition of the mine, has been engaged in the high work load, the high requirement of equipment, from March 2018 to purchase a E360LC a working 9000 hours (has), John Deere equipment excellent stability, economy of fuel and high work efficiency, won the fat profits for the company, also prompted the company less than a year had bought many sets of John Deere equipment, Deere either from the fuel consumption, performance, and after-sales service support, is special in their construction environment and requirements of mine, For Deere's excellent performance, manager wang introduced three aspects of E360 LC:
1, strong and durable, because mining hard stone on the Excavator injury is great, only a strong and durable Excavator, can gnaw. To crack. The line of the body of the John Deere excavator is very strong. Muscle sense & throughout; The leather is solid and heavy. Structural parts with a variety of durability details design, strong moving arm and bucket rod, using Q345D section of box-type steel reinforcement, arm reinforcement extension design of high load type X frame, using stronger toughness of Q345D steel, more solid and stable, effective load distribution.
2, fuel efficient, equipment to work more than 20 hours a day, work intensity is very high, efficiency is money. John Deere E360 LC excavator 224 kw engine power, outstanding all 360 class equipment, with 4 power modes +3 operating modes, to achieve a perfect balance between fuel consumption and efficiency; Average 2 ~ 3 minutes to fill a 42 tons of mining card dump Truck; Equipped with elongated crawler, it can well adapt to mine conditions; Also has the automatic idle function, can reduce the engine speed when the equipment has no hydraulic action, reduce fuel consumption. High efficiency and low cost.
3, super long warranty, quality service company has 6 John Deere excavators, excavators in the use of some problems, the quality of equipment and high quality of service inseparable, John Deere super long warranty: engine and hydraulic system enjoy 3 years or 6000 hours (whichever comes first) warranty; Structural parts enjoy 3 years or 10000 hours (the first to prevail) warranty, use assured, after - sales service of timely and thoughtful service, more no worries.
In the end, manager wang concluded: John Deere brand has a long history, strong appearance, durability, low failure rate, high attendance rate, timely after-sales service, John Deere E360 LC in the harsh operating environment with stable performance won our trust, worthy of the king of mines.
【Exclusive arrangement of China Road Machinery Network】As of April 30, 2024,Listed companies in the domestic construction machinery industry have released their performance reports for 2023.。 Sany Heavy Industry:Achieve total operating income of 74
Under a blue sky.,Waves of fine mist rose lightly.,Then it fell like a thread,Clean and cool for the city,The fresh air is set off by the white clouds on the horizon.,Draw a beautiful and harmonious ecological picture.。Above the road,“Ying Feng G
“May Day”On the occasion of International Labor Day,April 28,2024 National May Day Labor Award Results Announced in Beijing。This recognition,The All-China Federation of Trade Unions pays attention to recommending the target of developing ne
May 5,CCTV(CCTV-10)《Science fiction zone》Use 40 minutes of topic time,It tells about the railway construction heavy industry digging through the mountains.“The Iron and Steel Corps”——Rock drilling jumbo、Wet spraying troll
Copyright Notice 2002-2024 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China