November 10, 2022
The other day,FangyuanHZS180DThe concrete mixing station has been installed on the construction site of Huangdao District, Qingdao City.,Serving in the construction of the second undersea tunnel project in Jiaozhou Bay。

(During equipment installation,It will be put into use soon)
The second submarine tunnel of Jiaozhou Bay is the second all-weather cross-sea passage between the West Coast New Area and the main urban area of Qingdao.,To ease the traffic pressure between the new district and the main urban area of Qingdao.,It is of great significance to promote the economic and social development of the northern part of the new area and the westward extension area.。

(During equipment installation,It will be put into use soon)
Fangyuan Group Complete Equipment Co., Ltd. aims at the regional environment of the project.,Combined with the user's construction characteristics,Special design is made in terms of technology.,Meet the user's site requirements。
Complete Equipment Co., LtdYu Wenli
On December 12th, Asian Construction Equipment Group Co., Ltd. (abbreviated as ACE Group) Xuchang Production Base hosted a delegation of senior clients from The Republic of Tajikistan for an in-depth facility inspection. Guided by the warm winter sun, th
Despite the biting cold of early January, the spirit of international cooperation remained warm and vibrant. On January 5, 2026, three clients from Cameroon traveled thousands of miles to Henan, China, arriving with high expectations for a visit to Asian
Copyright Notice 2002-2026 global-ce.com Construction Machinery Online. All rights reserved.
Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China